Home / Projects

Public Buildings Energy Efficiency — Kırşehir (KABEV2)

Group 8: Kırşehir — Energy Audits and Design

Kırşehir · Energy efficiency

Main client: Ministry of Environment, Urbanisation and Climate Change

Client: General Directorate of Construction Affairs

Funding: World Bank

Joint venture: Altensis + BES-ENVE + ENVESU

Contract value: 336,000 USD · VAT included · joint venture total · ENVESU share 30%

Our service lines in this project

Feasibility and Planning

Design and BIM

Procurement and Tendering

Environmental and Social Management

Project scope / capacity

219,222 m² — Total construction area

4units — Campuses

16units — Buildings

Energy audits and design — Scope

Group 8: Kırşehir — Package

Energy efficiency improvement — Feature

Services provided

  • Energy Audit Reports
  • Design Services
  • Measurement and Verification
  • Environmental and Social Management
  • Tender Documents
  • Energy Performance Certificate (EPC)

Project summary

  • Technical scale: 16 public buildings on 4 campuses in Kırşehir, 219,222 m² in total
  • Environmental and social standard: World Bank Environmental and Social Framework (ESF)

Environmental and social scope

Environmental and social documents

  • Environmental and social management

Project images

Related projects

Renewable Energy and Energy Efficiency

Public Buildings Energy Efficiency — Konya (KABEV2)

Konya

Contract value: 350k USD

Schematic illustration

Renewable Energy and Energy Efficiency

Giresun Solar PV PID and Feasibility

Giresun

Contract value: 16k USD

Schematic illustration

Renewable Energy and Energy Efficiency

Renewable Energy PID and Feasibility

Türkiye

Contract value: 46k USD

Previous project: Public Buildings Energy Efficiency — Konya (KABEV2)

Next project: MoNE MADAD Clean Energy and Energy Efficiency

Planning a similar project?

Engineering · Consultancy · Project Management

Engineering for asustainable and resilientfuture.

We provide engineering, consultancy and project management services across every stage of the project life cycle, from feasibility to design and from procurement to construction supervision, on internationally financed water, energy, industrial and transport projects.

47projects
33 completed · 14 ongoing
32M USDapproximate total contract portfolio
128engineers, architects
and specialists
8international financial
institutions
01 / 05 Tokat Niksar Drinking Water Network Project Tokat · Financed by the World Bank

ENVESU · since 2021

We respond to the challenges posed by climate change with technically sound and environmentally responsible infrastructure. For public institutions, international financial institutions and private-sector investors, we manage projects from the first idea to operation with discipline in time, cost and quality.

Contract frameworksFIDIC · PRAG

On internationally financed projects, we carry out our design and supervision responsibilities within these contract frameworks.

Working with financial institutions
Integrated management systemISO 9001 · 14001 · 45001

Quality, environment and occupational health and safety in one system, with a dedicated Quality Plan for every project.

Quality and certificates
Digital engineering130,000 m²+ BIM

All disciplines in a single model; contracts, progress, cost and documents on one cloud platform.

Digital engineering

Services

From idea to operation: six service lines.

Each service line is backed by references across sectors, from water and environment to industry, and from energy to transport.

Where we work

All across Türkiye, from the Balkans to Central Asia.

Selected projects

On site, in design, at the table.

Insights

Notes from the field, views from the sector.

All insights

Financial institutions and clients

All organisations

Let's plan your next project together.

Feasibility, design, tender documents, project management or construction supervision: tell us what you need and the relevant team will get back to you.

+90 216 771 44 43
info@envesu.com