Renewable Energy & Energy Efficiency

Energy Efficiency in Public Buildings Projects (LOT 2 - Bursa)

The projects funded by The World Bank include the design energy efficient renovations and construction supervision of particular educational and hospital buildings having 143.000 sqm enclosed space (2 school campuses; Bursa Anatolian High School, Bursa Technical High School, and a hospital; Sevket Yilmaz Educational and Research Hospital) funded by the World Bank.

We provide services for;

• Review Energy Audits
• Multidisciplinary Design; Project
Management and Client Co-Ordination and Stakeholder Management and Communication
• Prepare Environmental and Social Management Plans
• Preparation of Tender Documents in accordance with the guidelines of World Bank and assist to PIU
• Preparation of all necessary technical specifications, Bill of Quantities
• Tender documents Procurement Management
• Construction Management
• Site Supervision of Contract Packages
• Quality and Cost Management
• On site supervision
• Training of Supervision team to be familiar with the designs, technical specifications, site conditions and contract documents
• Test & Commissioning & Taking-Over
• Obtaining and submission of as Built Drawings and Manuals
• Preparing the Energy Performance Certificates (EKB)
• Measurement & Verification
• Defects Liability Period


Programme

Renewable Energy & Energy Efficiency
Consultancy Services for Technical Designs and Construction Supervision Services for Energy Efficiency Renovations in Public Buildings

MAIN CLIENT

Ministry of Environment, Urbanization and Climate Change - General Directorate of Construction Affairs

CLIENT

Optimal + Optim Obermayer JV

CONSTRUCTION AREA

142.360 sqm